Changing A Mailbox Node - Nortel CallPilot 100 Administration Manual

Hide thumbs Also See for CallPilot 100:
Table of Contents

Advertisement

92
Chapter 7 Working with CCR Trees

Changing a Mailbox node

To change a Mailbox node
Log:
QUIT
RETRY
Admin
MBOX
AA
Admin
GLIST
CCR
CCR Admin
ADMIN
CCR tree:
RETRY
Tree: x
CHNG
Path:
RETRY
END
x
CHNG
ERASE
Mbox: xx
CHNG
Mbox:
DIR
Dest: <xxxx>
CHNG
Path:
RETRY
END
Tree: x
SAVE
PRINT
Save as tree x
YES
OTHR
Tree saved
CCR Admin
ADMIN
N0025636 02
Press ≤·°‹.
1
OK
Enter the System Administrator Mailbox number and password,
and then press OK.
Press OTHR.
2
OTHR
Press CCR.
3
Press ADMIN.
4
5
Enter the number of the CCR Tree that you want to change and press
OK
OK.
Press CHNG.
6
QUIT
Enter the Path of the node you want to change and press OK.
7
OK
LvMsg
Press CHNG.
8
OK
Press CHNG.
9
NEXT
10 Enter the new mailbox number.
QUIT
Make sure the mailbox is initialized before you assign it to a CCR
Tree.
11 Press OK if you want to accept the assigned destination type
OK
or
press CHNG and assign a new destination type.
12 Press END.
OK
13 Press SAVE.
QUIT
14 Press YES.
QUIT
15 This display appears briefly.
16 Press ® to end the session.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Callpilot 150100

Table of Contents