Installation Check Off List - Mendota SEABROOK D-30 Installation & Operating Instructions Manual

Direct vent gas fireplace insert
Hide thumbs Also See for SEABROOK D-30:
Table of Contents

Advertisement

The following check list must be completed prior to initial lighting of the Fireplace
Insert, or manufacturer's warranty and liabilities will be voided:
Venting system must be installed by a Mendota approved person according to
Figure 3, Pg. 7 with clamps securely in place and all joints leak proof.
Electrical supply and gas supply must be properly installed and must conform to
National and Local Codes.
Check that correct fuel supply is connected to appliance. Check correct gas pres-
sure, correct size gas lines and for gas leaks.
Proper clearances to combustibles must be maintained.
Be sure to check these items before final operation of the Fireplace Insert
All items on "Installation Check Off List" must be completed.
Connect Rocker Switch, Wall Switch, Remote Control or Thermostat to main valve.
Carefully follow all lighting and log installation instructions.
Take system millivolt readings [See Pg. 30]
Be sure pilot flame has a minimum of 450 millivolts.
Make certain that burner lights immediately and flame runs promptly around "curve" in
burner and lights entire burner. DO NOT proceed with operation unless burner cycles
"on/off" without delays and that the flame is "stable" and not "lifting" off burner.
Caution: If pilot goes out be sure to wait a minimum of 5 minutes before relighting.
Always light pilot with glass and logs removed.

INSTALLATION CHECK OFF LIST

LIGHTING CHECK OFF LIST
18

Advertisement

Table of Contents
loading

Table of Contents