INSTALLATION CHECK OFF LIST

Co-axial vent rigid pipe, wall vent cap or roof vent cap must be installed by a
Mendota approved person in accordance with instructions. All joints must be se-
cured, "twist-locked" and leak-proof. 1000
pipe joints of all DuraVent pipe sections. Sealant is not required for Amerivent.
Horizontal or vertical vent cap must be installed "right-side-up" and tightly
sealed to structure per instructions. Vent Caps must be Mendota approved.
Proper exterior and interior clearances for vent systems and locations for wall
vent cap/roof vent cap must be maintained.
Carefully check for correct gas pressure, proper size gas lines and for gas leaks.
115 V electrical service and gas supply must be installed in accordance with in-
structions and local and national codes.
All items on "Installation Check Off List" (see above) must be completed.
Connect thermostat to gas valve terminals [TPTH & TH]. Use solid copper wire.
See page 40 for wires specifications.
System Millivolt readings must be taken by a qualified installer.
CAUTION: Pilot flame must register a minimum of 325 millivolt.
Check air shutter opening - 1/8" to 1/4" Nat. gas or 1/2" LP gas.
Carefully follow all Lighting and Log Installation Instructions.
Make certain that burner lights immediately and flame runs promptly around
"curve" in burner and lights entire burner. DO NOT proceed with operation un-
less burner cycles "on/off" without delays.
Make certain that the flame is "stable" and does not "lift" off burner. If flame lifts
off burner, turn unit off and check that all vent pipes are "twist locked" and leak
proof, the vent cap is "right side up" and that 1000º Sealant has been used on the
inner pipe joints of all DuraVent pipe sections (Not required for Amerivent). DO
NOT proceed with operation if flame is "lifting off" burner.
Note: do not separate telescoping sections. They must be used as complete
assemblies.
Make certain glass door is in properly closed position and "centered" in firebox
opening.

LIGHTING CHECK OFF LIST