Follett Symphony Plus 25 series Operation And Service Manual page 8

25 and 50 series ice and water dispensers
Hide thumbs Also See for Symphony Plus 25 series:
Table of Contents

Advertisement

5. If power is to be supplied through counter
cut-out, complete steps 6-9. If power is
to be supplied through rear of dispenser,
proceed to step 10.
6. Temporarily remove rear access panel
(Fig. 4) from rear of dispenser.
7. Loosen junction box mounting screws. Lift
junction box and power cord up until cord
and mounting screws clear notches on
rear panel of dispenser. Remove Phillips
head screws from right side of junction
box.
8. Rotate junction box 90 degrees so that
screw holes on right side of junction box
align with holes on rear dispenser panel.
Resecure junction box to dispenser using
Phillips head screws.
9. Place power cord inside dispenser and
replace access panel (Fig. 4) to rear of
dispenser.
Note: For dispensers to be installed with utilities
connected through rear of dispenser, it may be
easier to make preliminary connections before
dispenser is set in place.
10. Apply a thick bead, approximately. 1/4"
(6 mm) diameter, of NSF listed silicone
sealant (Dow-Corning RTV-732 or
equivalent) 1/4" (6 mm) inside marked
outline of dispenser.
11. Carefully position dispenser on counter.
12. Remove four screws securing splash
panel to front of dispenser and gently lay
splash panel on counter. (Water line to
solenoid valve can be disconnected from
water inlet valve by pushing on ring at
end of inlet fitting while pulling on tubing.)
13. Secure dispenser to counter with four
3/8" bolts (supplied by others).
14. Smooth excess sealant around outside of
dispenser.
15. Run water supply line from back of
dispenser through utility knock-out
(Fig. 4) or up through counter cut-out.
Connect water supply line to 3/8" FPT
fitting on (Fig. 3G) utility flange at bottom
of dispenser.
16. Remove 3/4" drain connection plug from
either fitting at rear of dispenser (Fig. 3)
or internal fitting (Fig. 3), as appropriate.
Connect and run a dedicated drain line to
wall or floor drain. An air break should be
provided.
17. Proceed with either RIDE or top-mounted
ice machine connection instructions, as
appropriate.
* Dow Corning is a registered trademark of Dow Corning Corporation in the
United States and other countries
8
Fig. 4
3/4" MPT drain
(37.5 cm)
25CR/HR/FB and 50CR/HR/FB
access panel
utility connection
knock-out
ice transport
tube knock-out
5.875"
(14.9 cm)
0.8"
(20 mm)
6.375"
(16.2 cm)
10.5"
(26.7 cm)
14.75"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents