Rack-Mounting The Chassis - Cisco Catalyst 6807-XL Hardware Installation Manual

Hide thumbs Also See for Catalyst 6807-XL:
Table of Contents

Advertisement

Installing the Switch
Figure 9: Installing Shelf and Crossbar Brackets in a 17.75-inch Opening
1
2
3
4

Rack-Mounting the Chassis

Two people are required to lift the chassis. To prevent injury, keep your back straight and lift with your
Warning
legs, not your back. Statement 164
We recommend that you have a third person to assist in this procedure.
Tip
OL-30656-01
Left rail
Left shelf bracket
Right rail
Right shelf bracket
5
Two EA screws on each side, to secure the
shelf bracket to the rack
6
Crossbar bracket
7
One M3 screw on each side to secure the
crossbar bracket to the shelf
Cisco Catalyst 6807-XL Switch Hardware Installation Guide

Rack-Mounting the Chassis

37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents