Preparing for Installation
Task No.
6
5 Verify that each power supply installed in the chassis has a dedicated AC source circuit.
6 Refer to the power supply'VA rating as a sizing criteria in determining the output required by the UPS. The power supply kVA rating value is listed in the
specifications table for each power supply in Appendix A (power supply specifications).
OL-30656-01
Activity
EMI evaluation
• Distance limitations for signaling
• Site wiring
• RFI levels
Cisco Catalyst 6807-XL Switch Hardware Installation Guide
Site Preparation Checklist
Verified
Time
Date
By