Installing the Switch

Installation Tasks

The process of installing the switch can be broken down into a series of tasks described in the following table:
Table 10: Installation Tasks
Task
Unpacking the switch
Installing the rack-mount shelf kit
Rack-mounting the chassis
OL-30656-01
Accessory Kit, page 31
C H A P T E R
Description
Remove the switch from the packaging material.
We recommend that you save the packaging material for use
Note
later if you have to move the chassis.
Install the rack-mount shelves before you install the chassis in the rack.
The shelf brackets help support the weight of the chassis.
Install the chassis in a standard 19-inch rack, either open or enclosed.