Preparing To Install The Callpilot 100/150; Environment; Electrical Service; Opening The Kit - Nortel CallPilot 150 Installation And Maintenance Manual

Hide thumbs Also See for CallPilot 150:
Table of Contents

Advertisement

Chapter 3

Preparing to install the CallPilot 100/150

This chapter explains what you need before you install the CallPilot 100/150.

Environment

Make sure the installation area is:
clean, free of dust, dry and well ventilated
between 0 and 50 degrees Celsius
non-condensing relative humidity between 5 percent and 95 percent
at least 4 m, or 13 ft., from any equipment that could produce electromagnetic, radio frequency
and electrostatic interference
a wall area about 1 m (3 ft.) square
closer than 15 m, or 50 ft., of cable length from the Norstar KSU
within 1.5 m, or about 5 ft., of a three-wire grounded electrical outlet
a minimum of 16 cm, or 6 in., from a corner wall or other component
a minimum of 46 cm, about 18 in., from the floor, to prevent water damage

Electrical service

Make sure the power is:
115/230 VAC nominal; range 100 to 240 V
50/60 Hz nominal; range 47 to 63 Hz
Third-wire ground
Unswitched

Opening the kit

Open the box and ensure that you have all the pieces, as described below:
CallPilot 100/150
Power supply and power cord
Wall Mount Bracket
Four-wire, two-meter line cord
Documentation and Client Software CD
CallPilot 100/150 Installation and Maintenance Guide
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Callpilot 100

Table of Contents