Lotus Elise Service Notes page 376

Lotus cars elise service notes
Hide thumbs Also See for Elise:
Table of Contents

Advertisement

Earth Points
There are only two earth connections to the chassis, one at the front for the battery earth lead, and one at
the left hand side of the engine bay for the engine earth braid, and rear harness earthing requirements. At both
points, the anodised surface treatment must be removed from the chassis before an M8 Pulsert is fitted, with
a special stepped washer being used to clamp directly against the chassis surface. After assembly, coat the
chassis and cable terminals with petroleum jelly to protect from corrosion.
Engine
management
-ve binding post
Chassis rear
earth point
Battery earth
lead
Engine earth strap
[mlSTl
Page 20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M111 elise

Table of Contents