TGB BLADE 250 Service Manual page 130

Taiwan golden bee atv
Hide thumbs Also See for BLADE 250:
Table of Contents

Advertisement

To this chapter contents
11. CRANKCASE / CRANK
Install 2 dowel pins and new gasket.
Dowel pins
Install the left crankcase onto the right crankcase.
Tighten 11 bolts on the left crankcase.
11 bolts
Torque value: 0.8~1.2kgf-m
Tighten 2 bolts on the right crankcase.
Torque value: 0.8~1.2kgf-m
2 bolts
11-7

Advertisement

Table of Contents
loading

Table of Contents