Duct-Mounting Procedure - Honeywell IAQPoint2 Technical Manual

Indoor air quality monitor
Hide thumbs Also See for IAQPoint2:
Table of Contents

Advertisement

IAQPoint2

Duct-mounting procedure

The monitor can be mounted on a rectangular duct at least 7 in� × 7 in� (18 cm ×
18 cm) or a round duct at least 24 inches (61 cm) in diameter by two sheet metal
screws which are supplied in the installer's kit� Do not mount the monitor on the top
or bottom of a duct� (The sampling tube is designed for horizontal installation�)
Installation kit:
• IAQPoint2 monitor
• backplate
• Two metal screws
• Quick Start Guide (one page, paper)
Optional calibration kit (see page 11 for details)
Tools needed:
• drill
• hole saw
• drill bit
• #1, #2 Phillips, and 1/8 inch (3 mm) straight screwdrivers
• wire strippers
Procedure:
1� Make a 1 1 / 16 -inch (27 mm) hole in the duct at the desired sampling location�
2� Position the duct-mount bracket over the hole�
3� With a pencil, mark the locations for the two mounting holes�
4� Drill a hole in the duct at each of the marks�
5� Attach the mounting plate to the duct with the supplied sheet metal screws�
Torque the screws to 11 in-oz (79 Nmm)�
6� Slide the sampling tube through the mounting bracket up to the collar (shown in
the following illustration)�
Figure 13. Positioning the sampling tube in the mounting plate
7� Torque the case hex screws to screws to 7-10 oz-in (0�59-0�85 Nm)�
16

Advertisement

Table of Contents
loading

Table of Contents