Figure 2-9: Three-Switch Mbs Electrical Connection Drawing - Eaton 93PM User And Installation Manual

30-200 kw ups
Table of Contents

Advertisement

1. Bypass Input Breaker (BIB)
2. Maintenance Isolation Switch (MIS)
3. Maintenance Bypass Switch (MBP)

Figure 2-9: Three-switch MBS electrical connection drawing

For external MBS installation instructions, see a separate manual.
P-164000249
Revision 2
30-200 kW
User's and Installation Guide
21

Advertisement

Table of Contents
loading

Table of Contents