Table 1.3 Primequest 540A Main Unit Installation Specifications - Fujitsu PRIMEQUEST 580A Installation Planning Manual

Hide thumbs Also See for PRIMEQUEST 580A:
Table of Contents

Advertisement

Table 1.3 PRIMEQUEST 540A main unit installation specifications

Dimensions
Width
[mm (in.)]
Depth (*1)
Height
Weight [kg (lb)] (*2)
Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] (*3)
Exhaust air flow (*10)
3
[m
Temperature
and humidity
(*4)
Noise [dB (A)] (*7) (*10)
Sound power level [B (A)] (*7) (*10)
Allowable
vibration
[m/s
Allowable dust [mg/m
Power supply
Input voltage tolerance and No. of phases
Frequency and tolerance
Maximum power
consumption/apparent power
(*8)
Power factor
Inrush current [A] [Inrush duration] (*9)
Leakage current [mA] (*9)
CB/breaker capacity [A]
U41631-J-Z816-5-76
(Model name: MC4C0P3a1x)
Item
3
/min (ft
/min)]
Operating
Stand-by
Not operating
(*6)
Operating (including standby)
2
Not operating (*6)
]
3
]
With fans operating at
low speed
With fans operating at
high speed
Temperature [°C (°F)] (*5)
Humidity [%RH]
Maximum wet bulb
temperature [°C (°F)]
Temperature [°C (°F)] 0 to 40 (32 to 104)
Humidity [%RH]
Maximum wet bulb
temperature [°C (°F)]
Temperature [°C (°F)] 0 to 50 (32 to 122)
Humidity [%RH]
Maximum wet bulb
temperature [°C (°F)]
Operating
Not operating
1.3 Installation Specifications
Value
738 (29.06)
1100 (43.31)
1800 (70.87)
605 (1332)
22680 (21496)
39.1 (1380.8)
49.7 (1755.1)
20 to 80
26 (78.8)
20 to 80
26 (78.8)
8 to 80
27 (80.6)
66
8.5
2.5 (Synthetic
seismic vibration)
4.0 (Synthetic
seismic vibration)
0.15
200 to 240 VAC ± 10 %
50/60 Hz +2/-4 Hz
6,300 W/6,400 VA
300 VA
0.9 or more
100 or less
3.5 or less
20
1-15

Advertisement

Table of Contents
loading

Table of Contents