Power supply
Maximum
power
consumption/
apparent
power (*7)
Power factor
Inrush current [A] [Inrush duration] (*8)
Leakage current [mA] (*8)
CB/breaker capacity [A]
*1:
This value does not include any projection.
*2:
Value for the case the maximum allowable number of optional units is
mounted.
The weight of the unit based on the equipment configuration can be
calculated from the following formula:
*3:
There must be no condensation.
U41631-J-Z816-5-76
Item
Operating
Not operating Five SBs or five IO
Unit weight = 492 + (12 x A) + (15 x B) + (1 x C) + (10 x D)
A = Number of SBs mounted:
B = Number of IOUs mounted:
C = Number of GSWBs mounted: From a minimum of zero to a
D = Number of Additional Power Supply Units mounted:
Five SBs or five IO
Units or more
Four SBs or less and
four IO Units or less
Units or more
Four SBs or less and
four IO Units or less
From a minimum of one to a
maximum of eight
From a minimum of one to a
maximum of eight
maximum of two
From a minimum of zero to a
maximum of one
1.3 Installation Specifications
Value
10,600 W/
10,700 VA
5,890 W/
6,000 VA
300 VA
300 VA
0.9 or more
100 or less
3.5 or less
20
1-23