Backyard Discovery Highlander 6010 Owner's Manual page 39

Wooden playcenter - 2010
Table of Contents

Advertisement

ITEMS NEEDED
(1) M1 Wall Rail
(3) M5 Wall Rail
STEP 18
(Pilot drill with 3/16" drill bit when
using Lag Screws)
Attach M1 Wall Rail to B4 and B5 Club
House Legs with 5/16"x 2" Lag Screws,
5/16" Lock Washers and
flush with bottom of G8.
Now attach M5 Wall Rail to B5 Clubhouse
Legs on left side of Structure using
5/16"x 2" Lag Screws, 5/16" Lock
Washers and
Fender
Washers.
Now, attach a M5 Wall Rail Flush with Top
of Clubhouse Legs on both the left and
right side of structure with 5/16"x 2" Lag
Screws, 5/16" Lock Washers and
Washers.
M5
B5
M5
Fender
Washers
Fender
B5
B4
G8
M1
Top Floor
H2
M1
PAGE 37
HARDWARE NEEDED
(8) 5/16" x 2" Lag Screw
(8) Fender Washer
(8) 5/16" Lock Washer
B5
B4
M5
B4
B5
M5
B4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents