Hatteland HD 12T21 MMD User Manual page 33

Series x maritime multi display
Table of Contents

Advertisement

Installation Procedures
▼ 5: While unit is lying flat on table, check the Tilting Lock Pin position. These can be pulled out by hand, turned 90° (FIG1) and
turned back 90° until the Lock Pin automatically clicks into place by a spring (FIG2).
▼ 6: You may now mount the unit onto your desired location. It is advised that you unlock the Lock Pin (as shown in step 5), tilt
the unit 90 degrees backwards (FIG1) and properly fasten the bracket base into location (FIG2). NB! Be careful not to break
or scratch the edge of the front glass!
Unlock, tilt and lock
▼ 7: Max Forward and Backward angle shown below (FIG1). When your desired tilting position has been achieved, you need to
verify that the Lock Pin are in locking position and the unit is firmly attached and does not appear loose (FIG2).
FIG1
▼ 8: Depending on installation needs, you may mount the complete unit in ceiling in two different ways.
Normal Position: User Controls will be upside down, cables go straight up. You may configure Glass Display Control™ (GDC)
LED symbols to show or not, since symbols will be seen upside down.
Review http://www.hatteland-display.com/inb100018-4.php ("Glass Display Control™ (GDC) LED & Button operations" section).
Swapped Position: User Controls readable, cables has to bend up or go straight down, Left and Right Bracket needs to be
swapped, indicating Left Bracket on Right Side, and RIght Bracket on Left Side to ensure proper fitting and to avoid wrong
footprint of the mounting holes of the bracket base (reference to "Important to know about LEFT and RIGHT brackets").
Installation
IND100078-34
Glass Facing Up
FIG1
Normal Position
FIG1
Top View
FIG2
Use appropriate fasteners
6 pcs x M6 needed
Re-check Lock Pins!
Swapped Position
33
FIG2
Locked
Unlocked
FIG2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents