Monitoring Of Test Resources; Basic Safety Precautions; Pay Attention To The Instructions In The Operation Manual; Personnel Training - KERN CFS Operating Manual

Counting balance/counting system
Hide thumbs Also See for CFS:
Table of Contents

Advertisement

3.4 Monitoring of Test Resources

In the framework of quality assurance the measuring-related properties of the bal-
ance and, if applicable, the testing weight, must be checked regularly. The respon-
sible user must define a suitable interval as well as type and scope of this test. In-
formation is available on KERN's home page (www.kern-sohn.com with regard to
the monitoring of balance test substances and the test weights required for this. In
KERN's accredited DKD calibration laboratory test weights and balances may be
calibrated (return to the national standard) fast and at moderate cost.

4 Basic Safety Precautions

4.1 Pay attention to the instructions in the Operation Manual

Carefully read this operation manual before setup and commissioning, even if you
are already familiar with KERN balances.

4.2 Personnel training

The appliance may only be operated and maintained by trained personnel.
5 Transportation & Storage

5.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the appli-
ance itself when unpacking for possible visible damage.

5.2 Packaging / return transport

Keep all parts of the original packaging for a possibly required re-
turn.
Only use original packaging for returning.
Prior to dispatch disconnect all cables and remove loose/mobile
parts.
Reattach possibly supplied transport securing devices.
Secure all parts such as the glass wind screen, the weighing plat-
form, power unit etc. against shifting and damage.
CFS/CCS-BA-e-1013
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ccs

Table of Contents