Getting Started

1.1 Installing the UPS

The complete UPS cabinet is shipped on a single pallet. Use a forklift or a pallet jack, rated
to handle the weight of the cabinets (refer to Table J in Appendix A for cabinet weights) to
move the packaged cabinet to the installation site, or as close as possible to the site, before
unloading from the pallet.
This is the basic sequence of the installation steps:
1. Create an installation plan for the UPS system. (Chapter 1)
2. Prepare your site for the UPS system (Chapter 1)
3. Inspect, unpack, and unload the UPS cabinet. (Chapter 1)
4. Wire the system. (Chapter 2)
5. Install features, accessories, and/or options, as applicable. (Chapter 4 and 10)
6. Complete the installation checklist. (Chapter 2)
7. Have authorized service personnel perform preliminary operational checks and startup.
NOTE: Startup and operational checks should be performed only by authorized service
personnel. This service is usually offered as part of the service contract for your
UPS. Contact Global Services in advance (usually a two week notice is required) to
reserve a preferred startup date.

1.1.1 Creating an Installation Plan

Before beginning to install the UPS system, read and understand how this manual applies to
the system being installed. Use the procedures and illustrations in the following chapters to
create a logical plan for installing the system.