Hiniker C-PLOW 8801 Operator's Manual page 16

Pickup truck snowplow c-plow poly moldboard w/trip edge
Table of Contents

Advertisement

14
Plow Assembly
GENERAL INFORMATION
WARNING: To prevent personal injury
or death, be certain to keep clear of any
parts that may drop when removing
bundling straps, wires or brackets. Support
heavy sections with a hoist or blocks before
removing wires or straps.
In the following instructions, left and right machine
references are defined as being viewed from the
cab of the truck.
Be certain that hydraulic hoses and electrical
wires are safely routed and allow full motion of
moving parts. Secure loose wires with plastic tie
straps.
Some components are fastened at incorrect loca-
tions for shipping purposes.
All hardware should be tightened only enough to
ensure safety during assembly. Torque hardware
to specified values, as shown in the following
chart, only after assembly has been completed.
GRADE 5 TYPE B & F LOCK NUT
TORQUE VALUES
Diameter
Ft-lbs.
5/16"
3/8"
1/2"
5/8"
117-165
GRADE 5 BOLT TORQUE VALUES*
Size
Ft-lbs.
1/4"
3/8"
1/2"
73-103
5/8"
146-206
* applications without lock nuts
Replace worn bolts and lock nuts with grade
5 bolts and equivalent type B and type F lock
nuts. Type B lock nuts are plain hex; type F lock
nuts are flanged hex.
PLOW ASSEMBLY
N-m
13-18
17-25
23-33
31-44
58-82
79-112
158-223
N-m
8-12
11-16
29-41
39-56
99-140
198-279
PLOW ASSEMBLY
1.
Place the moldboard face down on card-
board or other padding that will prevent
scratches in the paint. Remove both skid as-
semblies from their shipping locations and
reassemble at the ends of the moldboard
with one 1" spacer and one 1/2" spacer be-
neath the moldboard tube.
Wrap hoist straps or padded chains around
the quadrant weldment, item 1 in drawing
5470, to support its weight.
Unbolt the quadrant from the back of the
moldboard assembly by removing eight hex
bolts and lock nuts. Rotate the quadrant to
its working position and line up eight holes
with holes into moldboard. Reassemble the
quadrant to the moldboard with the eight hex
bolts and lock nuts previously removed.
2.
Open the frame crate and set aside the power
unit box, headlamp boxes and parts box for
later. Carefully lift the frame assembly from
the crate by wrapping hoist straps or padded
chains around both ends of the 2 1/2 inch
square tube at the back of the frame assem-
bly.
Remove the 3/4 inch hex bolt, arrow 1 in
drawing 5420A, and two 1/2 inch hex bolts
and spacers, arrow 2, from the push frame.
DWG NO. 5470

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C-plow 8901

Table of Contents