Replacing The Front Panel Board; Required Tools; Preliminary Steps - Fujitsu PRIMERGY CX400 S1 Upgrade And Maintenance Manual

Server enclosure
Table of Contents

Advertisement

Front panel
11.1

Replacing the front panel board

Field Replaceable Units (FRU)
Average hardware task duration: 10 minutes

11.1.1 Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH2 / (+) No. 2 screw driver

11.1.2 Preliminary steps

Perform the following procedures:
"Shutting down the server node" on page 41
Ê
"Removing the server enclosure out of the rack" on page 43
Ê
V
CAUTION!
For ALL service tasks, remove the CX400 S1 server enclosure out of
the rack and put it on a separate desk!
It is not allowed to draw the CX400 S1server enclosure partially out
of the rack.
172
Upgrade and Maintenance Manual
CX400 S1