NOTE: To avoid injury to personnel and damage to equipment or prop-
erty when completing the procedures listed in this start-up checklist,
use good judgment, follow safe practices, and adhere to the safety
considerations/information as outlined in preceding sections of this
Installation, Start-Up, and Service document.
MODEL NO.: _________________________________
SOFTWARE VERSION _________________________
DATE: _______________________________________
INITIAL CHECKLIST:
DOES ELECTRICAL SERVICE CORRESPOND TO UNIT NAMEPLATE?
ARE ALL ELECTRICAL CONNECTIONS TIGHT?
DOES ALL FIELD WIRING CONFORM TO UNIT WIRING DIAGRAM?
IS UNIT INSTALLED PER IOM (LEVEL, CABINET PAINT CONDITION ACCEPTABLE, ETC.)?
IS THE CONDENSATE DISPOSAL SYSTEM OPERATING CORRECTLY?
PROPER SLOPE OF FIELD REVERSIBLE DRAIN PAN?
ARE END BEARING BOLTS ON FAN SHAFT TIGHT?
ARE DAMPERS OPERATING PROPERLY?
IS THE FILTER CLEAN?
IS EXPANSION VALVE BULB PROPERLY INSTALLED AND INSULATED?
PIPING CHECKLIST:
IS EXPANSION VALVE BULB PROPERLY INSTALLED AND INSULATED?
IS UNIT PIPING CORRECT AND INSULATED TO PREVENT CONDENSATION?
ARE THE CONTROL VALVE PACKAGES PIPED CORRECTLY?
ARE VALVE PACKAGES PROPERLY INSULATED?
ARE THERE ANY LEAKS DETECTED?
CONTROLS CHECKLIST:
DOES THE UNIT HAVE CARRIER CONTROLS ? IF SO, CONTINUE.
CHECK THAT THE UNIT OPERATES PER SEQUENCE OFOPERATION AS STATED IN THE CONTROLLER IOM.
RECORD THE THERMOSTAT READINGS IN TABLE BELOW.
Please Fill Out the Following:
Space Temperature
Discharge Air Temperature
Outdoor Air Temperature
Outdoor Air Damper Position
Space Setpoint
Unoccupied Offset
Minimum Position
Deadband
Outdoor Air Damper
Face/Bypass Damper
UNIT START-UP CHECKLIST
SERIAL NO.: ______________________________________
TECHNICIAN: ____________________________________
Controller Points
Set Points
Position (Open / Closed / %)
CL-3
Reading