Framing - Valor Horizon 534JLN Installation & Owner's Manual

Dv gas fireplace heater
Table of Contents

Advertisement

QUALIFIED
INSTALLER
•• A non-combustible hearth is not necessary in front of this appliance.
•• Note that the unit is installed at the framing stage and  xed to framing using support angles. See page 30. Wall
 nish is then installed over the support angles up to the black frame on the unit.
NOTE: If using a 613CCB front, refer to the kit's instruction manual for framing dimensions.
When the appliance is installed directly on carpeting, tile or other combustible material other than wood  ooring,
the appliance shall be installed on a metal or wood panel extending the full width and depth of the appliance.
29-3/4" to wall finish
30-3/4" when using
645CFV Clearview Front
FRAMING IN A CORNER
20
20

Framing

Wall Finish
16" min. straight out or off the top venting.
Allow for elbow if rear vent with rise.
45-1/2" (115.5 cm) min.
1-1/2"
(38 mm)
min.
clearance
33-3/4" to
header
This is the framing
width. Wall finish
to 32-3/16" wide.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Horizon 534jlpHorizon 534irnHorizon 534irp

Table of Contents