Step 4: Parallel Bar Handrail Assembly
Install the eight 3/8" x 3/4" bolts (153) and 3/8" flat washers (59) into the holes on the
•
underside of the frame. Only thread them into the holes two or three turns so the slots in
the handrail brackets can slide onto the bolts easily. Slide the handrail onto the bolts and
hand-tighten them. Thread the eight 3/8" x 2" bolts (226) into the sides of the handrails.
Once all the bolts are installed tighten all of them securely.
Install the Lift Bars (192) to the parallel bars and secure with the knobs (207).
•
Install the rear step (181) by sliding into the receiving tubes under the rear of the deck and
•
secure with the two pins (217). Raising the rear incline may make it easier to line up the
holes for the pins.
26
MT200