Power Connections And Initial Power On - Mellanox Technologies MTS3600Q-1BNC User Manual

Infiniscale iv 36-port qsfp infiniband switch
Hide thumbs Also See for MTS3600Q-1BNC:
Table of Contents

Advertisement

16
4.
Clip the nuts into the holes in the rack you will be using to connect the rail slides. Check that
both sides of the switch are in the same position number on the rack.
5.
Using two of the pan head screws and one washer, for each rail, install the rails to the other end
of the rack. Place the rail behind the holes in the rack and screw the screws through the holes in
the washer then through the rails. Tighten the pan head screws that hold the rails to 9.2 Nm or
81.5 pound inches.
6.
Place the four bolts for the caged nuts within reach.
7.
Slide the switch into the rails.
8.
Put the switch into place and screw the bolts into the nuts from step 4. Tighten the bolts to 9.2
Nm or 81.5 pound inches.
9.
Tighten all of the screws.
10. Plug in the power cables.
11. Check the Status LEDs and confirm that all of the LEDs show status lights consistent with nor-
mal operation.
12. You can start connecting all of the cables to the switch.

2.2.3 Power Connections and Initial Power On

The switch platform ships with one or two Power Supply Units. For switches with only one unit installed, a
second PSU may be installed at a later time. Each supply has a separate AC receptacle. The input voltage is
Rev 2.0.0
Figure 10: Screwing in the Rails
Warning: Any yellow status LEDs is cause for concern and must be dealt with
immediately.
Mellanox Technologies
The caged nuts
are separated by a
single space

Advertisement

Table of Contents
loading

Table of Contents