Solectria Renewables PVI 10kW Installation And Operation Manual page 18

208, 240 and 480vac commercial, grid-tied photovoltaic inverter
Table of Contents

Advertisement

PVI 10kW / PVI 13kW / PVI 15kW
LED indicator
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
green:
yellow:
red:
DOCR-060002 rev30
Operating condition
standby (night)
initialization
stop
stop
waiting for
stronger sun
waiting,
checking grid
starting / synchronizing
waiting for
AC disconnect/breaker to be closed
AC fuse blown
(one phase)
AC VOLTAGE TOO HIGH
(alternating green & red LED)
feeding grid
MPP or constant voltage mode
de-rating mode or inverter at full power
GFDI fuse failure
Installation and Operation Manual
Description
input voltage < 125 VDC
unit is being initialized
Input voltage low < 210V
(275V @ startup)
input voltage high > 430V
(475 VDC is the maximum allowable
PV open circuit voltage)
available DC power is too low
presence of valid grid conditions
Is being checked
-starting transformer
-synchronization to grid
-closing contactor
grid voltage
Is absent
One AC power fuse blown
Or one v-sense fuse blown
Or one grid phase off/blown
AC Grid Voltage above UL limits
(>228V if 208VAC, >528V if 480VAC)
normal daytime operation
reduction of power fed to the grid
due to increased temperature of the
heatsink or inverter is at full rated power
GFDI fuse is defective
see chapter 5
18
July 7, 2010

Advertisement

Table of Contents
loading

Table of Contents