a. Lift the PCI riser cage thumbscrews (1).
b. Turn the thumbscrews counter-clockwise to loosen them (2).
c. Lift the PCI riser cage from the server (3).
Installing the PCI riser cage
CAUTION: If a RILOE board is installed in the riser cage, the
cable to the system board must be removed after the riser cage is
partially lifted from the server.
CAUTION: To prevent damage to the server or expansion
boards, power down the server and remove all AC power cords before
removing or installing the PCI riser cage.
Server operations
41