Powering Up And Configuring The Server - HP ProLiant DL385 User Manual

Hewlett-packard server user guide
Hide thumbs Also See for ProLiant DL385:
Table of Contents

Advertisement

7. Connect the power cord to the AC power source.

Powering up and configuring the server

To power up the server, press the Power On/Standby button.
While the server boots, RBSU and the ORCA utility are automatically
configured to prepare the server for operating system installation.
IMPORTANT: When using cable management arm components, be
sure to leave enough slack in each of the cables to prevent damage to
the cables when the server is extended from the rack.
WARNING: To reduce the risk of electric shock or damage
to the equipment:
Do not disable the power cord grounding plug. The grounding
plug is an important safety feature.
Plug the power cord into a grounded (earthed) electrical outlet
that is easily accessible at all times.
Unplug the power cord from the power supply to disconnect
power to the equipment.
Do not route the power cord where it can be walked on or
pinched by items placed against it. Pay particular attention to
the plug, electrical outlet, and the point where the cord extends
from the server.
Server setup
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents