IMPORTANT: Be sure to connect the hard drive in the bottom (primary) bay to the bottom
(primary) connector on the hard drive cable and connect the hard drive in the top
(secondary) bay to the top (secondary) connector on the hard drive cable.
11. Connect the hard drive cable to each hard drive installed in the drive cage
assembly (1).
12. Align the tabs on the drive cage assembly with the spaces on the server blade (2)
and rotate down into place in the server blade (3).
13. Tighten the drive cage assembly thumbscrew (4).
14. Connect the other end of the hard drive cable to the connector on the system
board (5).
Figure 4-11: Installing the drive cage assembly and hard
drive cable

Memory

You can expand system memory by installing synchronous DDR DIMMs. A
ProLiant BL30p server blade supports up to two PC2100 ECC registered DDR
SDRAM DIMMs.