Wayne-Dalton TORQUEMASTER 6100 Installation Instructions And Owner's Manual page 14

Single and double spring
Hide thumbs Also See for TORQUEMASTER 6100:
Table of Contents

Advertisement

10
Tools Needed:
Center the bottom section in the door
opening. level section using wooden
level
shims (if necessary) under the bottom
section.
11
Tools Needed:
IMPORTANT: ThE TOPs Of ThE
VERTICal TRaCks MusT bE lEVEl
3/16" Drill bit
fROM sIDE TO sIDE. If ThE bOTTOM
Power Drill
sECTION Was shIMMED TO lEVEl IT.
7/16" socket
ThE VERTICal TRaCk ON ThE shIMMED
Driver
sIDE, MusT bE RaIsED ThE hEIGhT Of
ThE shIM.
Tape Measure
level
Position the left hand vertical track
assembly over the rollers of the bottom
step ladder
section. Make sure the counterbalance
cable is located between the rollers
and the door jamb. Drill 3/16" pilot
holes into the jambs for the lag
screws. loosely fasten jamb brackets
and flagangle to the jamb using
5/16" x 1-5/8" lag screws. Tighten lag
screw securing bottom jamb bracket to
jamb, to maintain 5/8" spacing. hang
cable drum over flagangle.
Repeat for the right hand side.
14
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
bottom Section
vertical Track
lEVEl
bOTTOM sECTION
flaGaNGlE
VERTICal
5/16" x
TRaCk
1-5/8" laG
assEMbly
sCREWs
jbus
jaMb
bRaCkET
q.I. jaMb
bRaCkET
bOTTOM
sECTION
WOOD shIMs
(If NECEssaRy)
VERTICal TRaCk
bOTTOM sECTION
5/8"
ROllER
laG
laG
sCREW
sCREW
lOCaTIONs
lOCaTIONs
12R qI flaGaNGlE
15R qI flaGaNGlE
quICk INsTall
jaMb bRaCkET
laG
sCREW
lOCaTIONs
laG
12R & 15R fully
sCREW
aDjusTablE flaGaNGlE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Torquemaster plus 6100 windload

Table of Contents