Test Operation

1.

Test Operation

1.1

Procedure and Outline

Follow the following procedure to conduct the initial test operation after installation.
1.1.1 Check Work Prior to Turn Power Supply on
1.1.2 Turn Power on
Turn outdoor unit power on.
Carry out field setting on
outdoor PC board
Turn indoor unit power on.
64
Be sure to turn the power on 6 hours before starting operation to protect
compressors. (to power on clankcase heater)
For field settings, refer to "Field Settings" on and after P81.
After the completion of field settings, set to "Setting mode 1".
SiUS39-601
(V3056)
Test Operation