Data Hiway Testing - Siemens Advance Network Gateway User Manual

Gateway with ethernet
Hide thumbs Also See for Advance Network Gateway:
Table of Contents

Advertisement

How to Test the Data Hiway,
Measuring Shield
Continuity
62

Data Hiway Testing

Continued
Data Hiway shield lead continuity can be checked by performing the fol-
lowing procedures:
Ground Data Hiway cable shields at only one end of each segment. This
practice reduces ground loop noise.
Step
1.
With Data Hiway communicating with connected Nodes,
temporarily disconnect Channel A shield lead from ground.
2.
Connect 10K ohm resistor to disconnected shield and con-
nect battery positive (+) lead to resistor. Resistor should be
in series with the battery. Connect battery negative (-) lead
to unit ground.
3.
Connect DVM positive (+) lead to channel A and connect
shield and negative (-) to unit ground. Measured voltage
potential should be 9 Vdc.
4.
If 9 Vdc is not measured, the channel A shield line is
grounded at another point; correct problem.
5.
Reconnect channel A and shield lead.
6.
Repeat steps 1 through 5 for Channel B.
7.
Repeat steps 1 through 6 for each shield ground point on
the Data Hiway cable.
Procedure
2000590-001

Advertisement

Table of Contents
loading

Table of Contents