Powering On The Switch; Figure 12. Removing The Dust Cover From The Sfp; Figure 13. Connecting The Fiber Optic Cable - Allied Telesis AT-9000/24 Installation Manual

Layer 2 gigabit ethernet switch
Hide thumbs Also See for AT-9000/24:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Chapter 2: Installation
1. Remove the dust plug from the SFP, as shown in Figure 12.
803

Figure 12. Removing the Dust Cover from the SFP

2. Connect the fiber optic cable to the SFP port, as shown in Figure 13.
799

Figure 13. Connecting the Fiber Optic Cable

Powering On the
To power on the switch, perform the following procedure:
Switch
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 14.
42

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents