Figure 14. Plugging In The Ac Power Cord - Allied Telesis AT-9000/24 Installation Manual

Layer 2 gigabit ethernet switch
Hide thumbs Also See for AT-9000/24:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Figure 14. Plugging in the AC Power Cord

2. Plug the other end of the power cord into a wall outlet.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, "Troubleshooting" on page 47.
The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to "Starting a
Local Management Session" on page 44. To start a remote
management session, the switch must have an IP address. For
information about giving the switch an IP address and starting a
remote management session, refer to the AT-S81 Management
Software User's Guide.
AT-9000/24 Gigabit Ethernet Switch Installation Guide
7
5
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents