Installing an Optional SFP Transceiver

The AT-9000/24 Gigabit Ethernet Switch has four SFP uplink ports.
To install an SFP transceiver, perform the following procedure:
Note
The transceiver can be hot-swapped; you do not need to power off
the switch to install a transceiver. However, always remove the
cables before removing the transceiver.
Note
You must install the transceiver before you connect cables to it.
1. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
Warning
An SFP transceiver can be damaged by static electricity. Be sure to
observe all standard electrostatic discharge (ESD) precautions,
such as wearing an antistatic wrist strap, to avoid damaging the
transceiver.
2. Remove the dust plug from the SFP slot, as shown in Figure 9.

Figure 9. Removing the Dust Plug from the SFP Slot

3. Locate the label on the transceiver and turn it so that the label is on top
and the alignment groove is on the bottom.