Allied Telesis AT-9000/24 Installation Manual page 31

Layer 2 gigabit ethernet switch
Hide thumbs Also See for AT-9000/24:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
AT-9000/24 Gigabit Ethernet Switch Installation Guide
Circuit Overloading: Consideration should be given to the
connection of the equipment to the supply circuit and the effect
that overloading of circuits might have on overcurrent protection
and supply wiring. Appropriate consideration of equipment
nameplate ratings should be used when addressing this
concern.
23
Warning: Mounting of the equipment in the rack should be such
that a hazardous condition is not created due to uneven
mechanical loading.
27
If installed in a closed or multi-unit rack assembly, the operating
ambient temperature of the rack environment may be greater
than the room ambient temperature. Therefore, consideration
should be given to installing the equipment in an environment
compatible with the manufacturer's maximum rated ambient
temperature (Tmra).
38
Caution: Installation of the equipment in a rack should be such
that the amount of air flow required for safe operation of the
equipment is not compromised.
39
Warning: Reliable earthing of rack-mounted equipment should
be maintained. Particular attention should be given to supply
connections other than direct connections to the branch circuits
(e.g., use of power strips).
40
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents