Condensate Trap Tubing (Factory-Shipped Orientation); Condensate Trap Location (Alternate Upflow Orientation) - Carrier 58MVP Installation, Start-Up, And Operating Instructions Manual

Series 180 4-vvay mumtipoise dkect-vent variabme-capacity condensing gas furnace
Table of Contents

Advertisement

PLUG
CAP
COLLECTOR
DRAIN
TUBE
(BLUE
& WHITE
STRIPED)
COLLECTOR
TUBE
(PINK)
DRAIN
TUBE
(BLUE
& WHITE
STRIPED)
COLLECTOR
BOX
TUBE
(PINK)
©
(MOLDED)
DRAIN
TUBE
(BEHIND
COLLECTOR
BOX
DRAIN
TUBE)
DRAIN
TUBE
(BLUE)
COLLECTOR
BOX
TUBE
(GREEN)
FACTORY-SUPPLIED
DRAIN
TUBE
COUPLING
(LEFT
DRAIN
OPTION)
FIELD-INSTALLED
FACTORY-SUPPLIED
DRAIN
TUBE
FIELD-INSTALLED
FACTORY-SUPPLIED
//2 -IN
CPVC
STREET
ELBOWS
(2) FOR
LEFT
DRAIN
OPTION
FIELD-INSTALLEE
FACTORY-SUPPLIED
DRAIN
TUBE
COUPLING
(RIGHT
DRAIN
OPTION)
A94213
Fig. 7--Factory-SNpped
Upflow Tube Configuration
(Shown With Blower Access
Panel Removed}
(ONDENSATE
TRAP
TLTBING
(FACTORY_SHIPPED
ORIENTATION)
NOTE:
See Fig
7 or tube routing
label
on main furnace
door to
confirm
location
of these
tubes
1. Collector
Box Drain, Inducer
Honsing
Drain_ Relief Port, and
Pressure
Switch
Tubes
These tubes should be factory
attached
to condensate
trap and
pressure
switch
ready for use in UPFLOW
applications.
These
robes can be identified
by their connection
location
and also
by a color
label
on each tube. These
tubes are identified
as
follows:
collector
box &ain tube (blue label), inducer
housing
&ain
robe
(violet
label
or molded),
relief
port
robe (green
label), and pressure
switch
robe (pink label).
2. Condensate
Trap Drain
Tube
The condensate
trap drain
connection
must
be extended
for
field attachment
by doing
the fbllowing:
a. Detem_ine
location
of field drain connection.
(See Fig. 2 or
7.)
NOTE:
If internal
filter or side filter media
cabinet
is used., &ain
robe should be located
to opposite
side of casing
flora return
duct
attachment
to assist
in filter removal
b. Remove
and discard
casing
drain
hole plug
button
from
desired
side.
COLLECTOR
BOX
TUBE
(GREEN)
COLLECTOR
BOX
DRAIN
TUBE
(GREEN)
TRAP
HOUSING
DRAIN
TUBE
(VIOLET)
O O
A94214
Fig. 8--Alternate
Upflow Tube Configuration
and
Trap Location
c
Install
drain
tube
coupling
grommet
(fScto_--supplied
in
loose parts
bag) in selected
casing
hole.
d. Slide
&ain
robe coupling
(fi_ctoryosupplied
in loose parts
bag)
through
grommet
so long
end
of coupling
fitces
blower.
e
Cement
2 factolw-supplied
1/2-in.
street (PVC
elbows
to
rigid drain tube connection
on condensate
trap. (See Fig. 7.)
These
elbows
must be cemented
together
and cemented
to
condensate
trap drain
connection.
NOTE:
Failure
to use CPVC
elbows
may
allow
drain
to kink,
preventing
draining.
f\ (onnect
larger
diameter
drain
robe
and
clamp
(factor-
supplied
in loose parts
bag) to condensate
trap and clamp
securely.
g. Route robe to coupling
and cut to appropriate
length.
h. Attach
robe to coupling
and clamp
securely.
COND]_NSATE
TRAP
LOCATION
(ALTERNATE
UPFLOW
ORIENTATION)
An alternate
location
for the condensate
trap is the leR_hand
side
of casing.
(See Fig. 2 and 8.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents