Carrier 58MVP Installation, Start-Up, And Operating Instructions Manual page 29

Series 180 4-vvay mumtipoise dkect-vent variabme-capacity condensing gas furnace
Table of Contents

Advertisement

Tab{e7--Maximum AHowable PipeLength(Ft) Continued
ALTITUDE
8001 to 7000_
A_titude
7001 to 80005
A_titude
8001 to 9000_
A_titude
9001 to t0000_
UNiT
SRZE
040-14
060-14
080-14
080-20
100-20
120-20
Unit
Size
040-14
060-14
080-14
080-20
100-20
120-20
Unit
Size
040-14
060-14
080-14
080-20
100-20
120-20
Unit
Size
040-14
060-14
080-14
080-20
100-20
120-20
TERMiNATiON
TYPE
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
Termination
Type
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
Termination
Type
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
Termination
Type
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 2-In.
Concentric
2 Pipe or 3-In.
Concentric
PIPE DIAMETER
(IN.)*
1-1/2
2
1-1/2
2
1-1/2
2
2
2-1/2
31
Pipe Diameter
(In.)*
1-1/2
2
1-1/2
2
1-1/2
2
2
2-1/2
3?
Pipe Diameter
(In.)*
1-1/2
2
1-1/2
2
1-1/2
2
2
2-1/2
3?
Pipe Diameter
(In.)*
1-1/2
2
1-1/2
2
1-1/2
2
2
2-1/2
3?
NUMBER OF 90 ° ELBOWS
1
2
3
4
5
6
35
30
25
20
15
10
70
70
68
67
66
64
35
30
25
20
15
10
70
70
68
67
66
64
20
15
10
5
NA
NA
70
70
68
67
62
57
31
26
21
16
11
6
70
70
68
67
66
64
49
48
47
45
44
43
Number of 90 ° Elbows
1
2
3
4
5
6
32
27
22
17
12
7
66
65
63
62
60
59
32
27
22
17
12
7
66
65
63
62
60
59
18
13
8
NA
NA
NA
66
65
63
62
57
52
29
24
19
14
9
NA
66
65
63
62
60
59
46
44
43
41
40
38
Number of 90 ° Elbows
1
2
3
4
5
6
30
25
20
15
10
5
62
60
58
56
55
53
30
25
20
15
10
5
62
60
58
56
55
53
17
12
7
NA
NA
NA
82
80
58
56
51
46
27
22
17
12
7
NA
62
60
58
56
55
53
43
41
39
37
35
34
Number of 90 ° Elbows
1
2
3
4
5
6
27
22
17
12
7
NA
57
55
53
51
49
47
27
22
17
12
7
NA
57
55
53
51
49
47
15
10
5
NA
NA
NA
57
55
53
51
46
41
24
19
14
9
NA
NA
57
55
53
51
49
47
39
37
35
33
31
29
* Disk usage--Unless
otherwise
stated, use perforated disk assembly
(factory-supplied
in loose parts bag)
1 Wide radius elbow
$ Vent sizing for Canadian
installations
over 4500 ft (1370m)
above sea level are subject to acceptance
by the local authorities
having jurisdiction.
NA--Not
Allowed;
pressure
switch will not make
NOTES:
1. Do not use pipe size greater than those specified
in table or incomplete combustion,
flame disturbance,
or flame sense lockout may occur.
2. Size both the combustion-air
and vent pipe independently,
determine
the smallest diameter allowed by the table for each pipe, then use the larger diameter for both
pipes
3. Assume two 45 ° elbows
equal one 90 ° elbow
Long radius elbows
are desirable
and may be required in some cases
4. Elbows and pipe sections within the furnace casing and at the vent termination
should not be included
in vent length or elbow count.
5. The minimum
pipe length is 5 fl for all applications
2P

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents