Rack Warnings and Cautions
Installing Hardware Options
Install any hardware options before initializing the server. For options installation
information, refer to the option documentation. For server-specific information, refer to
Chapter 4, "Hardware Options Installation."
Server Shipping Contents
Unpack the server-shipping carton and locate the materials and documentation necessary for
installing the server. All the rack-mounting hardware necessary for installing the server into
the rack is included with the rack or the server.
The contents of the server-shipping carton include:
•
Server
•
HP ProLiant DL145 Server Support CD
•
Setup documentation
•
Power cord
•
Rack-mounting hardware
HP ProLiant DL145 Server User Guide
WARNING: To reduce the risk of personal injury or equipment damage, be sure that:
•
The leveling jacks are extended to the floor.
•
The full weight of the rack rests on the leveling jacks.
•
The stabilizers are attached to the rack for single-rack installation.
•
The racks are coupled together in multiple-rack installations.
•
Only one component is extended at a time. A rack may become unstable if more
than one component is extended for any reason.
WARNING: Always mount the heaviest item on the bottom of the rack and work from
the bottom to the top.
Server Setup
3-5