Removal and Replacement Procedures

Rack Warnings and Cautions

2-2
WARNING: Setting the server blade Power On/Standby button to the standby position
removes power from most areas of the server blade. This process may take
30 seconds, during which time some internal circuitry remains active. To remove power
completely, remove the server blade from the server blade enclosure.
WARNING: To reduce the risk of personal injury from hot surfaces, allow the internal
system components to cool before touching them.
CAUTION: When performing non-hot-plug operations, you must power down the server
blade and/or the system. However, it may be necessary to leave the server blade powered up
when performing other operations, such as hot-plug installations or troubleshooting.
WARNING: The power supply enclosure and the server blade enclosure are very
heavy. To reduce the risk of personal injury or damage to the equipment:
Observe local occupational health and safety requirements and guidelines for
manual material handling.
Remove hot-plug power supplies and server blades from their enclosures before
installing or removing the enclosures.
Use caution and get help to lift and stabilize enclosures during installation or
removal, especially when the enclosure is not fastened to the rack.
WARNING: Always use at least two people to lift a power supply enclosure or server
blade enclosure into the rack. If the enclosure is being loaded into the rack above chest
level, a third person MUST assist with aligning the enclosure with the rails while the
other two people support the weight of the enclosure.
WARNING: To reduce the risk of personal injury or damage to the equipment, be sure
that:
The leveling jacks of the rack are extended to the floor.
The full weight of the rack rests on the leveling jacks.
The stabilizers are attached to the rack if it is a single rack installation.
The racks are coupled in multiple rack installations.
WARNING: When installing the server blade enclosure in a telco rack, be sure that the
rack frame is adequately secured to the building structure.
WARNING: To reduce the risk of personal injury or damage to the equipment, at least
two people are needed to safely unload the rack from the pallet. An empty 42U rack
weighs 115 kg (253 lb), is over 2.1 m (7 ft) tall, and may become unstable when being
moved on its casters. Do not stand in front of the rack as it rolls down the ramp from
the pallet, but handle the rack from both sides.
HP ProLiant BL40p Server Blade Maintenance and Service Guide