Grounding The Switch; Power Connections And Initial Power On; Figure 25: Status Leds 5 Minutes After Power On - Mellanox Technologies SwitchX-2 MSX1012B-1BFS User Manual

Switchx-2 12 port ethernet switch system
Table of Contents

Advertisement

Rev 1.0
3.4

Grounding the Switch

Check to determine if your local or national electrical codes require an external ground to all IT
components. If so, connect a ground wire to one of the casing screws and connect the other end to
a valid ground. If you choose to not use the ground screw, make sure that the rack is properly
grounded and that there is a valid ground connection between the chassis of the switch and the
rack. Test the ground using an Ohm meter.
3.5

Power Connections and Initial Power On

The switch platform ships with power supply unit. Each supply has a separate AC receptacle.
The input voltage is auto-adjusting for 100 - 240VAC, 50-60Hz power connections. The power
cords should be standard 3-wire AC power cords including a safety ground and rated for 15A or
higher.
36
Mellanox Technologies

Figure 25: Status LEDs 5 Minutes After Power On

Warning: Any yellow or red status LEDs are cause for concern and must be dealt
with immediately.
It can take up to 5 minutes to boot up, during which time the status LED may indicate
red.
Some national and/or local codes may require IT components to be bonded and exter-
nally grounded (not including the power cord ground). You must follow all national
and local codes when installing this equipment.
Caution: The switch platform will automatically power on when AC power is
applied. There is no power switch. Check all boards, power supplies, and fan tray
modules for proper insertion before plugging in a power cable.
PS1
PS2
UID
RST
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchx-2 msx1012b-2bfsSwitchx-2 sx1012

Table of Contents