Section 1
DESCRIPTION OF THE "Parilla REEDSTER 125cc"ENGINE
1.1.
1.2.
Engine characteristics / operation limits
1.3.
1.4.
1.5.
Section 2
PREPARATION & INSTALLATION OF THE ENGINE ON THE CHASSIS
2.1.
2.2.
Install the water cooling system
2.3.
Preparation of the engine
2.4.
2.5.
Install of the carburettor
2.6.
Charging the oil in the gear box
2.7.
Installation of the engine on the chassis
2.8.
Installation of the clutch cover with the H.T coil.
2.9.
Section 3
USE OF THE ENGINE
3.1.
3.2.
3.3.
3.4.
Starting and stoppping the engine
3.5.
3.6.
3.7.
3.8.
3.9.
Section 4
ENGINE BASIC MAINTENANCE
4.1.
Recommendations on the centrifugal clutch
4.2.
Clutch assembly/disassembly
4.3.
4.4.
4.5.
4.6.
4.7.
Fastener torque table
Wiring diagram
I N D E X
(only F3 - F4 versions)
(only for F1 - F2 - F4)
0
N° Page
1
1
2
3
4
5
6
6
7
10
10
11
13
14
15
16
21
21
22
22
22
23
27
28
28
28
29
29
31
32
33
34
37
37
38
39
40
41
42
42
43
MAN-051 ING