Installing The Cpe On A Wall - Cisco LRE CPE Hardware Installation Manual

Table of Contents

Advertisement

Installing the CPE

Installing the CPE on a Wall

Tip
Step 1
Step 2
Cisco LRE CPE Hardware Installation Guide
2-18
We recommend that you attach the Ethernet, telephone, and power cables to the
CPE before mounting it on wall because the connectors might be hidden from
view after the CPE is installed. For more information, see the connection
procedures beginning with the
page
2-21.
Locate the screw template. The template is used to align the mounting screw
holes.
The template has adhesive to hold it in place while you drill holes in the
Note
wall. If you have purchased a 6- or 24-multipack, you will be using the
same screw template to install each CPE. Do not use the adhesive.
Instead, hold the template against the wall while you drill the screw holes
and insert the screws.
Position the screw template so that the cable lock hole is facing toward the floor.
(See
Figure
2-5.) This ensures that the cables will face toward the floor after they
are connected.
Do not attach the screw template to the wall yet.
Note
"Connecting to a 10/100 Port" section on
Chapter 2
Installation
78-11469-04

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents