Front-Panel Description - Cisco LRE CPE Hardware Installation Manual

Table of Contents

Advertisement

Chapter 1
Overview

Front-Panel Description

For more information about installing a Catalyst LRE switch, refer to the switch
hardware installation guide.
Front-Panel Description
Each Cisco LRE CPE has a READY LED and a POWER LED. The
Cisco 575 LRE CPE and Cisco 576 LRE 997 CPE also have an ACT LED and an
ETH LED. The Cisco 585 LRE CPE also has four LEDs, labeled ETH1 through
ETH4.
Figure 1-3
to
Figure 1-5
show the front panels of the CPEs.
Table 1-2
and
Table 1-3
list the front-panel LEDs and their meanings.
Figure 1-3
Front Panel of the Cisco 575 LRE CPE
Cisco LRE CPE Hardware Installation Guide
1-5
78-11469-04

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents