Mounting Considerations; Bulkhead Mount - Furuno SC-50S Operator's Manual

Thd satellite compass
Table of Contents

Advertisement

1.2
Mounting the Processor Unit
1.2.1

Mounting considerations

The processor unit should be mounted aligned with the ship's fore-and-aft line. It
can be mounted on the deck, bulkhead, or on the underside of a desk. When
choosing a mounting location keep the following points in mind.
• Choose a mounting location which allows you to easily view the power lamp
on the top of the unit and which is within ± 2.5° of the ship's fore-and-aft line.
• Choose a location where vibration and shock are minimal.
• Install the unit well away from locations subject to rain and water splash.
• Locate the unit away from air conditioner vents.
• Keep the unit out of direct sunlight because of heat that can build up inside its
cabinet.
• Choose a well-ventilated location.
• Leave sufficient space around the unit to permit access for maintenance. See
the outline drawing for recommended maintenance space.
1.2.2

Bulkhead mount

The processor unit is shipped from the factory ready for bulkhead mounting.
Orient the processor unit as shown below and fix it to the mounting location with
four tapping screws (M5x20). You will set the orientation later on the menu.
Mounting Method: "Wall"
Mounting Direction: D
Reference Direction
Bulkhead
Name Plate (other side)
Direction
A
Direction D
(Bulkhead)
Direction
C
Bulkhead mount
Mount processor unit so
reference direction is within
±
2.5° of fore-and-aft line.
Mounting Method: "Wall"
(Bulkhead)
Mounting Direction: A
Direction B
Mounting Method: "Wall"
Mounting Direction: B
Mounting Method: "Wall"
(Bulkhead)
Mounting Direction: C
1. INSTALLATION
(Bulkhead)
1-11

Advertisement

Table of Contents
loading

Table of Contents