Cleaning The Steam Lines And Pressure Vessel - FULTON 60E Operator, Service & Parts Manual

E series gas fired steam boilers
Table of Contents

Advertisement

2
MONOBLOC GAS VALVES (FIG. 9) continued.
ADJUSTMENTS 40E - 60E (MBZRDLE 415/420 BO1)
ADJUSTMENTS
A
Main Gas Governor.
B
First and second stage -
initial lift adjuster, main gas valve.
C
High flame throughput
D
Low flame throughput.
E
Gas supply test point
F
Boiler side test point
G
Low gas pressure switch
2.17 CLEANING STEAM LINES AND PRESSURE VESSEL
During the first week of boiler operation, clean all oil and dirt from the boiler, steam line and condensate
return line.
(a)
Disconnect the condensate return pipe adjacent to the condensate return tank.
(b)
Direct the returns to a floor drain or other safe discharge point and make safe.
(c)
Leave in this position for one week to allow all impurities to flush through.
(d)
Drain the boiler completely each day.
(e)
After the week is completed, drain and flush the condensate return tank, removing all installation
sediment. Reconnect the condensate return pipe to the condensate return tank.
A
G
E
ACTION
Turn clockwise to increase gas pressure. Range 4 - 20 mbar.
Slacken locking screw, turn fluted knob anticlockwise to
increase, clockwise to decrease.
Turn fluted knob anticlockwise to increase,
clockwise to decrease.
C
GFSE-Std-0499
B
F
D
2
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

50e40e30e20e15e10e ... Show all

Table of Contents