To ensure the efficiency of the boiler, carry out the regular maintenance instructions detailed below.
If any fault is found during these operations contact your Fulton representative.
Note: It is essential that regular checks are made to ensure that scale build-up is not taking place
within the boiler. Such checks will ensure that water treatment being applied to the boiler feed
water is effective.
The lower hand hole doors should be removed after one month of operation and the interior of the boiler
thoroughly examined. If scale or sludge build up is observed, it should be removed and the water treatment
supplier advised.
New gaskets must be fitted every time a handhole door is removed.
Subsequent interior examinations should be carried out on a regular basis until satisfactory conditions are
observed. Thereafter, inspections should be carried out at three monthly intervals.
4.2 (a)
SAFETY VALVE
OUTLET
SECTION 4
4.3 (d)
DISCONNECT BURNER
FROM GAS HEAD
4.3 (d)
REMOVE THE
BURNER
PLATE SCREWS
FIG. 16 BOILER MAINTENANCE
GFSE-Std-0499
MAINTENANCE
F03230
4
28