CLEANING STEAM LINES AND PRESSURE vESSELS

During the first week of boiler operation, clean all oil and dirt from the boiler, the steam line and
condensate return line.
1. Disconnect the condensate return pipe adjacent to the condensate return tank.
2. Direct the returns to a floor drain or other safe discharge point and make safe.
3. Leave in this position for one week to allow all impurities to flush through.
4. Drain the boiler completely each day.
5. After the week is completed, drain and flush the condensate return tank, removing all
installation sediment. Reconnect the condensate return pipe to the condensate return tank.