Input 1 And 2 Ac Input Coupling Test - Fluke 43B Service Manual

Power quality analyzer
Hide thumbs Also See for 43B:
Table of Contents

Advertisement

Table 4-3. Volts AC Measurement Verification Points
Sensitivity
Input 1
Input 2
200 mV/div
200A/div
2V/div
2kA/div
20V/div
20kA/div
1)
The 500V and 1250V range will be tested in Section 4.5.14

4.5.10 Input 1 and 2 AC Input Coupling Test

Proceed as follows to test the Input 1 and 2 AC coupled input lower transition point:
1. Connect the test tool to the 5500A as for the previous test (see Figure 4-5).
2. Select the AUTO test tool setup:
Press
Press
Press
3. Select AC coupling & reading for Input 1 and 2.
Press
Press
Press
Press
Press
Press
Press
Press
Press
Press
Press
Press
Press
Time
5500A output
base
Volts rms
10 ms/d
500 mV
20 µ/d
500 mV
20 µ/d
5V
10 ms/d
5V
10 ms/d
50V
20 µ/d
50V
to select the MENU.
till SCOPE is highlighted.
to select SCOPE mode
to select menu SCOPE SETUP.
to select Input 1 READING.
to highlight ACrms.
mark changes to I.
to confirm;
to highlight Input 1 Coupling.
to select the Input 1 Coupling menu.
to highlight AC Coupling.
mark changes to I.
to confirm;
select Input 2 READING.
to select the Input 2 READING
to highlight ACrms.
mark changes to I.
to confirm;
to highlight Input 2 Coupling.
4.5 Input 1 and Input 2 Tests in the SCOPE MODE.
5500A
Frequency
60 Hz
494.0 to 506.0
20 kHz
486.0 to 514.0
20 kHz
4.860 to 5.140
60 Hz
4.940 to 5.060
60 Hz
49.40 to 50.60
20 kHz
48.60 to 51.40
Performance Verification
Reading 1 & 2
Input 1
Input 2
494.0 to 506.0
4.940 to 5.060
49.40 to 50.60
4
4-19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents