Set-Up; Unpacking And Inspection - AEG Protect 1. M Operating Instructions Manual

Table of Contents

Advertisement

4

Set-up

Unpacking and Inspection

4.1
The unit has been completely checked and inspected.
Although the device has been packed and shipped with the
usual degree of care, damage during transport cannot be ruled
out completely.
i
Check the shipping container for damage on arrival. If
necessary, ask the transport company to check the goods and
make a record of the damage in the presence of the transport
company employee and report the damage to the AEG
representative or dealer within eight days of delivery.
Check the delivery is complete:
♦ PROTECT 1.M system cabinet
♦ 6 slot covers for the module racks
♦ Slot cover cap with integrated LC display
♦ Communication module
♦ RS232 communication cable
♦ Management software "CompuWatch" on CD
♦ Operating instructions
Delivery of external (factory-fitted) battery modules includes:
♦ External battery unit
♦ Special battery connection cable
♦ Brief instructions with battery handling regulations
Please contact our hotline (see page 5) in case of any
discrepancy.
1. Remove the packaging bands and lift up the cardboard box
to remove it (see Fig. 1)
Claims for damage during transport must
always be made with the transport company!
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents