Set-Up And Operation; Unpacking And Inspection - AEG PROTECT B. 750 Operating Instructions Manual

Table of Contents

Advertisement

4

Set-Up and Operation

4.1

Unpacking and Inspection

The unit has been fully tested and inspected. Although the unit
has been packed and shipped with the usual degree of care,
damage during transport cannot be ruled out completely.
i
Check the shipping container for damage on arrival. If
necessary, ask the transport company to check the goods and
make a record of the damage in the presence of the member
of staff from the transport company and register the damage
with the AEG representative or dealer within eight days of
delivery.
Check the delivery is complete:
Check for complete delivery of ordered options like additional
battery modules, 19" mounting kits or communication options
like a SNMP card etc.
Please contact our hotline (see page 4) in case of any
discrepancy.
The original packaging provides effective protection against
mechanical shocks and should be retained so the unit can be
transported safely later on.
Claims for damage during transport must always
be made with the transport company!
PROTECT B. with 700, 1000, 1500, 2000 or 3000 VA
Two plastic feet plus two fixing bras (for B.3000)
Mains connection cable with shockproof plug
Two load connection cables
USB / RS232 communication cable
CD with "CompuWatch" shutdown software
Operating instructions
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A protect b. 1500Protect b. 3000Protect b. 1000Protect b. seriesProtect b. 1500

Table of Contents